In Citizens Against Airport Pollution v. City of San Jose, (6th Dist. 2014) 173 Cal.Rptr.3d 794, the court affirmed the City of San Jose’s approval of the eighth addendum to the San Jose International Airport Master Plan EIR, adopted in 2007 (“Master Plan”), which was prepared Master Plan amendments that the City adopted in 2010. The amendments included changes to the size and location of cargo facilities, the replacement of air cargo with general aviation facilities, and the modification of two taxiways. The petitioners first argued that a new EIR was required because these changes constituted a new project, but the court rejected this argument.